This repository has been archived on 2026-11-17. You can view files and clone it, but cannot push or open issues or pull requests.
gitgram-ai/aitimemachine/beads/cmd/bd/critical_paths_test.go
caelum0x 49b183818c Unify gitgram + aitimemachine into the monorepo (de-submodule) and merge vendored engines
Convert gitgram/ and aitimemachine/ from embedded git repos (which showed as
opaque submodule gitlinks on GitHub) into fully-tracked first-party content.

AITM now merges its 7 vendored repos as first-party engines:
- memory: beads (Go task DAG) + context7 (docs SDK), unified into saved_contexts
- git: vendored C git (bundled binary) + gitnexus (in-process code intelligence)
- agentic: a2a (@a2a-js/sdk) + pal (AITM-managed Python subprocess)

Includes the full session's product build: Gitgram web/mobile/backend features,
AITM website/CLI/MCP, the unified memory layer, engine build tooling
(scripts/build-engines.sh, Dockerfile, CI), docs (README, ENGINES.md, ARCHITECTURE.md),
and extensive test suites.

Build artifacts, node_modules, external/, and gemini-cli are gitignored.

Co-Authored-By: Claude Opus 4.8 (1M context) <noreply@anthropic.com>
2026-06-23 14:14:09 +03:00

726 lines
20 KiB
Go

//go:build cgo
package main
import (
"context"
"fmt"
"path/filepath"
"testing"
"time"
"github.com/steveyegge/beads/internal/types"
)
// TestBurnWisps tests direct wisp deletion via burnWisps.
func TestBurnWisps(t *testing.T) {
t.Parallel()
ctx := context.Background()
tmpDir := t.TempDir()
testDB := filepath.Join(tmpDir, ".beads", "beads.db")
s := newTestStore(t, testDB)
t.Run("DeletesSingleWisp", func(t *testing.T) {
wisp := &types.Issue{
Title: "Wisp to burn",
Status: types.StatusOpen,
Priority: 2,
IssueType: types.TypeTask,
Ephemeral: true,
CreatedAt: time.Now(),
}
if err := s.CreateIssue(ctx, wisp, "test"); err != nil {
t.Fatalf("Failed to create wisp: %v", err)
}
result, err := burnWisps(ctx, s, []string{wisp.ID})
if err != nil {
t.Fatalf("burnWisps failed: %v", err)
}
if result.DeletedCount != 1 {
t.Errorf("DeletedCount = %d, want 1", result.DeletedCount)
}
if len(result.DeletedIDs) != 1 || result.DeletedIDs[0] != wisp.ID {
t.Errorf("DeletedIDs = %v, want [%s]", result.DeletedIDs, wisp.ID)
}
// Verify wisp is actually gone
_, err = s.GetIssue(ctx, wisp.ID)
if err == nil {
t.Error("Expected error getting deleted wisp, got nil")
}
})
t.Run("DeletesMultipleWisps", func(t *testing.T) {
var ids []string
for i := 0; i < 3; i++ {
wisp := &types.Issue{
Title: "Batch wisp",
Status: types.StatusOpen,
Priority: 2,
IssueType: types.TypeTask,
Ephemeral: true,
CreatedAt: time.Now(),
}
if err := s.CreateIssue(ctx, wisp, "test"); err != nil {
t.Fatalf("Failed to create wisp %d: %v", i, err)
}
ids = append(ids, wisp.ID)
}
result, err := burnWisps(ctx, s, ids)
if err != nil {
t.Fatalf("burnWisps failed: %v", err)
}
if result.DeletedCount != 3 {
t.Errorf("DeletedCount = %d, want 3", result.DeletedCount)
}
if len(result.DeletedIDs) != 3 {
t.Errorf("DeletedIDs length = %d, want 3", len(result.DeletedIDs))
}
})
t.Run("EmptyIDs", func(t *testing.T) {
result, err := burnWisps(ctx, s, []string{})
if err != nil {
t.Fatalf("burnWisps failed: %v", err)
}
if result.DeletedCount != 0 {
t.Errorf("DeletedCount = %d, want 0", result.DeletedCount)
}
})
t.Run("InvalidIDsContinue", func(t *testing.T) {
// Create one valid wisp
wisp := &types.Issue{
Title: "Valid wisp",
Status: types.StatusOpen,
Priority: 2,
IssueType: types.TypeTask,
Ephemeral: true,
CreatedAt: time.Now(),
}
if err := s.CreateIssue(ctx, wisp, "test"); err != nil {
t.Fatalf("Failed to create wisp: %v", err)
}
// Mix valid and invalid IDs — burnWisps should continue past failures
result, err := burnWisps(ctx, s, []string{"nonexistent-id", wisp.ID})
if err != nil {
t.Fatalf("burnWisps failed: %v", err)
}
// The valid wisp should still be deleted even though the first ID failed
if result.DeletedCount < 1 {
t.Errorf("DeletedCount = %d, want at least 1", result.DeletedCount)
}
})
}
// TestAutoCloseCompletedMolecule tests that closing the last step auto-closes the parent molecule.
func TestAutoCloseCompletedMolecule(t *testing.T) {
t.Parallel()
ctx := context.Background()
tmpDir := t.TempDir()
testDB := filepath.Join(tmpDir, ".beads", "beads.db")
s := newTestStore(t, testDB)
t.Run("ClosesWhenAllStepsComplete", func(t *testing.T) {
// Create molecule root
root := &types.Issue{
Title: "Auto-close molecule",
Status: types.StatusOpen,
Priority: 1,
IssueType: types.TypeEpic,
Labels: []string{BeadsTemplateLabel},
CreatedAt: time.Now(),
}
if err := s.CreateIssue(ctx, root, "test"); err != nil {
t.Fatalf("Failed to create root: %v", err)
}
// Create two steps — one closed, one open
step1 := &types.Issue{
Title: "Step 1",
Status: types.StatusClosed,
Priority: 2,
IssueType: types.TypeTask,
CreatedAt: time.Now(),
}
step2 := &types.Issue{
Title: "Step 2",
Status: types.StatusOpen,
Priority: 2,
IssueType: types.TypeTask,
CreatedAt: time.Now(),
}
for _, step := range []*types.Issue{step1, step2} {
if err := s.CreateIssue(ctx, step, "test"); err != nil {
t.Fatalf("Failed to create step: %v", err)
}
if err := s.AddDependency(ctx, &types.Dependency{
IssueID: step.ID,
DependsOnID: root.ID,
Type: types.DepParentChild,
}, "test"); err != nil {
t.Fatalf("Failed to add parent-child dep: %v", err)
}
}
// Close step2 (the last open step)
if err := s.CloseIssue(ctx, step2.ID, "done", "test-actor", "test-session"); err != nil {
t.Fatalf("Failed to close step2: %v", err)
}
// Now trigger auto-close
autoCloseCompletedMolecule(ctx, s, step2.ID, "test-actor", "test-session")
// Verify root is now closed
updatedRoot, err := s.GetIssue(ctx, root.ID)
if err != nil {
t.Fatalf("Failed to get root: %v", err)
}
if updatedRoot.Status != types.StatusClosed {
t.Errorf("Root status = %q, want %q", updatedRoot.Status, types.StatusClosed)
}
})
t.Run("DoesNotCloseWhenStepsRemain", func(t *testing.T) {
// Create molecule root
root := &types.Issue{
Title: "Incomplete molecule",
Status: types.StatusOpen,
Priority: 1,
IssueType: types.TypeEpic,
Labels: []string{BeadsTemplateLabel},
CreatedAt: time.Now(),
}
if err := s.CreateIssue(ctx, root, "test"); err != nil {
t.Fatalf("Failed to create root: %v", err)
}
// Create two steps — one closed, one still open
step1 := &types.Issue{
Title: "Closed step",
Status: types.StatusClosed,
Priority: 2,
IssueType: types.TypeTask,
CreatedAt: time.Now(),
}
step2 := &types.Issue{
Title: "Open step",
Status: types.StatusOpen,
Priority: 2,
IssueType: types.TypeTask,
CreatedAt: time.Now(),
}
for _, step := range []*types.Issue{step1, step2} {
if err := s.CreateIssue(ctx, step, "test"); err != nil {
t.Fatalf("Failed to create step: %v", err)
}
if err := s.AddDependency(ctx, &types.Dependency{
IssueID: step.ID,
DependsOnID: root.ID,
Type: types.DepParentChild,
}, "test"); err != nil {
t.Fatalf("Failed to add parent-child dep: %v", err)
}
}
// Auto-close after closing step1 — step2 still open
autoCloseCompletedMolecule(ctx, s, step1.ID, "test-actor", "test-session")
// Verify root is still open
updatedRoot, err := s.GetIssue(ctx, root.ID)
if err != nil {
t.Fatalf("Failed to get root: %v", err)
}
if updatedRoot.Status != types.StatusOpen {
t.Errorf("Root status = %q, want %q (steps still open)", updatedRoot.Status, types.StatusOpen)
}
})
t.Run("NoOpForOrphanIssue", func(t *testing.T) {
// Create an issue not part of any molecule
orphan := &types.Issue{
Title: "Orphan issue",
Status: types.StatusClosed,
Priority: 2,
IssueType: types.TypeTask,
CreatedAt: time.Now(),
}
if err := s.CreateIssue(ctx, orphan, "test"); err != nil {
t.Fatalf("Failed to create orphan: %v", err)
}
// Should not panic or error — just no-op
autoCloseCompletedMolecule(ctx, s, orphan.ID, "test-actor", "test-session")
})
t.Run("NoOpForAlreadyClosedMolecule", func(t *testing.T) {
// Create molecule root that's already closed
root := &types.Issue{
Title: "Already closed molecule",
Status: types.StatusClosed,
Priority: 1,
IssueType: types.TypeEpic,
Labels: []string{BeadsTemplateLabel},
CreatedAt: time.Now(),
}
if err := s.CreateIssue(ctx, root, "test"); err != nil {
t.Fatalf("Failed to create root: %v", err)
}
step := &types.Issue{
Title: "Step in closed mol",
Status: types.StatusClosed,
Priority: 2,
IssueType: types.TypeTask,
CreatedAt: time.Now(),
}
if err := s.CreateIssue(ctx, step, "test"); err != nil {
t.Fatalf("Failed to create step: %v", err)
}
if err := s.AddDependency(ctx, &types.Dependency{
IssueID: step.ID,
DependsOnID: root.ID,
Type: types.DepParentChild,
}, "test"); err != nil {
t.Fatalf("Failed to add dep: %v", err)
}
// Should not panic — early return because root is already closed
autoCloseCompletedMolecule(ctx, s, step.ID, "test-actor", "test-session")
})
t.Run("ClosesWhenReparentedStepExcluded", func(t *testing.T) {
// Create molecule root (Epic A)
root := &types.Issue{
Title: "Epic with reparented child",
Status: types.StatusOpen,
Priority: 1,
IssueType: types.TypeEpic,
Labels: []string{BeadsTemplateLabel},
CreatedAt: time.Now(),
}
if err := s.CreateIssue(ctx, root, "test"); err != nil {
t.Fatalf("Failed to create root: %v", err)
}
// Create 3 child steps with dotted IDs (triggers Strategy 2 in loadDescendants)
var steps []*types.Issue
for i := 1; i <= 3; i++ {
step := &types.Issue{
ID: fmt.Sprintf("%s.%d", root.ID, i),
Title: fmt.Sprintf("Step %d", i),
Status: types.StatusOpen,
Priority: 2,
IssueType: types.TypeTask,
CreatedAt: time.Now(),
}
if err := s.CreateIssue(ctx, step, "test"); err != nil {
t.Fatalf("Failed to create step %d: %v", i, err)
}
if err := s.AddDependency(ctx, &types.Dependency{
IssueID: step.ID,
DependsOnID: root.ID,
Type: types.DepParentChild,
}, "test"); err != nil {
t.Fatalf("Failed to add parent-child dep for step %d: %v", i, err)
}
steps = append(steps, step)
}
// Create Epic B for reparenting target
epicB := &types.Issue{
Title: "Epic B (reparent target)",
Status: types.StatusOpen,
Priority: 1,
IssueType: types.TypeEpic,
CreatedAt: time.Now(),
}
if err := s.CreateIssue(ctx, epicB, "test"); err != nil {
t.Fatalf("Failed to create Epic B: %v", err)
}
// Reparent step 3: remove old parent dep, add new one to Epic B
if err := s.RemoveDependency(ctx, steps[2].ID, root.ID, "test"); err != nil {
t.Fatalf("Failed to remove old parent dep: %v", err)
}
if err := s.AddDependency(ctx, &types.Dependency{
IssueID: steps[2].ID,
DependsOnID: epicB.ID,
Type: types.DepParentChild,
}, "test"); err != nil {
t.Fatalf("Failed to add new parent dep: %v", err)
}
// Close steps 1 and 2 (the remaining children of Epic A)
for _, step := range steps[:2] {
if err := s.CloseIssue(ctx, step.ID, "done", "test-actor", "test-session"); err != nil {
t.Fatalf("Failed to close %s: %v", step.ID, err)
}
}
// Trigger auto-close — should succeed since only 2 children remain
autoCloseCompletedMolecule(ctx, s, steps[1].ID, "test-actor", "test-session")
// Verify root auto-closed (reparented step should be excluded from molecule)
updatedRoot, err := s.GetIssue(ctx, root.ID)
if err != nil {
t.Fatalf("Failed to get root: %v", err)
}
if updatedRoot.Status != types.StatusClosed {
t.Errorf("Root status = %q, want %q (reparented step should be excluded from molecule)", updatedRoot.Status, types.StatusClosed)
}
})
}
// TestFindStaleMolecules tests detection of complete-but-unclosed molecules.
func TestFindStaleMolecules(t *testing.T) {
t.Parallel()
ctx := context.Background()
tmpDir := t.TempDir()
testDB := filepath.Join(tmpDir, ".beads", "beads.db")
s := newTestStore(t, testDB)
// Create a stale molecule: open epic with all children closed
staleRoot := &types.Issue{
Title: "Stale molecule",
Status: types.StatusOpen,
Priority: 1,
IssueType: types.TypeEpic,
CreatedAt: time.Now(),
}
if err := s.CreateIssue(ctx, staleRoot, "test"); err != nil {
t.Fatalf("Failed to create stale root: %v", err)
}
closedChild := &types.Issue{
Title: "Closed child",
Status: types.StatusClosed,
Priority: 2,
IssueType: types.TypeTask,
CreatedAt: time.Now(),
}
if err := s.CreateIssue(ctx, closedChild, "test"); err != nil {
t.Fatalf("Failed to create closed child: %v", err)
}
if err := s.AddDependency(ctx, &types.Dependency{
IssueID: closedChild.ID,
DependsOnID: staleRoot.ID,
Type: types.DepParentChild,
}, "test"); err != nil {
t.Fatalf("Failed to add dep: %v", err)
}
// Create a non-stale molecule: open epic with open children
activeRoot := &types.Issue{
Title: "Active molecule",
Status: types.StatusOpen,
Priority: 1,
IssueType: types.TypeEpic,
CreatedAt: time.Now(),
}
if err := s.CreateIssue(ctx, activeRoot, "test"); err != nil {
t.Fatalf("Failed to create active root: %v", err)
}
openChild := &types.Issue{
Title: "Open child",
Status: types.StatusOpen,
Priority: 2,
IssueType: types.TypeTask,
CreatedAt: time.Now(),
}
if err := s.CreateIssue(ctx, openChild, "test"); err != nil {
t.Fatalf("Failed to create open child: %v", err)
}
if err := s.AddDependency(ctx, &types.Dependency{
IssueID: openChild.ID,
DependsOnID: activeRoot.ID,
Type: types.DepParentChild,
}, "test"); err != nil {
t.Fatalf("Failed to add dep: %v", err)
}
t.Run("FindsStaleNotActive", func(t *testing.T) {
result, err := findStaleMolecules(ctx, s, false, false, false)
if err != nil {
t.Fatalf("findStaleMolecules failed: %v", err)
}
// Should find the stale molecule
found := false
for _, mol := range result.StaleMolecules {
if mol.ID == staleRoot.ID {
found = true
if mol.TotalChildren != 1 {
t.Errorf("TotalChildren = %d, want 1", mol.TotalChildren)
}
if mol.ClosedChildren != 1 {
t.Errorf("ClosedChildren = %d, want 1", mol.ClosedChildren)
}
}
if mol.ID == activeRoot.ID {
t.Error("Should not find active molecule as stale")
}
}
if !found {
t.Errorf("Did not find stale molecule %s in results", staleRoot.ID)
}
})
t.Run("BlockingFilter", func(t *testing.T) {
// Create an issue blocked by the stale molecule
blockedIssue := &types.Issue{
Title: "Blocked by stale",
Status: types.StatusOpen,
Priority: 2,
IssueType: types.TypeEpic,
CreatedAt: time.Now(),
}
if err := s.CreateIssue(ctx, blockedIssue, "test"); err != nil {
t.Fatalf("Failed to create blocked issue: %v", err)
}
if err := s.AddDependency(ctx, &types.Dependency{
IssueID: blockedIssue.ID,
DependsOnID: staleRoot.ID,
Type: types.DepBlocks,
}, "test"); err != nil {
t.Fatalf("Failed to add blocking dep: %v", err)
}
// With blocking filter, should find the stale molecule
result, err := findStaleMolecules(ctx, s, true, false, false)
if err != nil {
t.Fatalf("findStaleMolecules (blocking) failed: %v", err)
}
found := false
for _, mol := range result.StaleMolecules {
if mol.ID == staleRoot.ID {
found = true
if mol.BlockingCount == 0 {
t.Error("Expected blocking count > 0")
}
}
}
if !found {
t.Errorf("Did not find blocking stale molecule %s", staleRoot.ID)
}
})
t.Run("UnassignedFilter", func(t *testing.T) {
// Create an assigned stale molecule
assignedRoot := &types.Issue{
Title: "Assigned stale",
Status: types.StatusOpen,
Priority: 1,
IssueType: types.TypeEpic,
Assignee: "some-agent",
CreatedAt: time.Now(),
}
if err := s.CreateIssue(ctx, assignedRoot, "test"); err != nil {
t.Fatalf("Failed to create assigned root: %v", err)
}
assignedChild := &types.Issue{
Title: "Assigned child closed",
Status: types.StatusClosed,
Priority: 2,
IssueType: types.TypeTask,
CreatedAt: time.Now(),
}
if err := s.CreateIssue(ctx, assignedChild, "test"); err != nil {
t.Fatalf("Failed to create assigned child: %v", err)
}
if err := s.AddDependency(ctx, &types.Dependency{
IssueID: assignedChild.ID,
DependsOnID: assignedRoot.ID,
Type: types.DepParentChild,
}, "test"); err != nil {
t.Fatalf("Failed to add dep: %v", err)
}
// Unassigned filter should exclude the assigned molecule
result, err := findStaleMolecules(ctx, s, false, true, false)
if err != nil {
t.Fatalf("findStaleMolecules (unassigned) failed: %v", err)
}
for _, mol := range result.StaleMolecules {
if mol.ID == assignedRoot.ID {
t.Errorf("Unassigned filter should exclude assigned molecule %s", assignedRoot.ID)
}
}
})
}
// TestBuildBlockingMap tests the helper that builds the blocking relationship map.
func TestBuildBlockingMap(t *testing.T) {
t.Parallel()
t.Run("EmptyInput", func(t *testing.T) {
result := buildBlockingMap(nil)
if len(result) != 0 {
t.Errorf("Expected empty map, got %d entries", len(result))
}
})
t.Run("SingleBlocker", func(t *testing.T) {
blocked := []*types.BlockedIssue{
{
Issue: types.Issue{ID: "issue-1"},
BlockedByCount: 1,
BlockedBy: []string{"blocker-1"},
},
}
result := buildBlockingMap(blocked)
if issues, ok := result["blocker-1"]; !ok {
t.Error("Expected blocker-1 in map")
} else if len(issues) != 1 || issues[0] != "issue-1" {
t.Errorf("blocker-1 blocks %v, want [issue-1]", issues)
}
})
t.Run("MultipleBlockers", func(t *testing.T) {
blocked := []*types.BlockedIssue{
{
Issue: types.Issue{ID: "issue-1"},
BlockedByCount: 2,
BlockedBy: []string{"blocker-a", "blocker-b"},
},
{
Issue: types.Issue{ID: "issue-2"},
BlockedByCount: 1,
BlockedBy: []string{"blocker-a"},
},
}
result := buildBlockingMap(blocked)
// blocker-a blocks both issue-1 and issue-2
if issues, ok := result["blocker-a"]; !ok {
t.Error("Expected blocker-a in map")
} else if len(issues) != 2 {
t.Errorf("blocker-a blocks %d issues, want 2", len(issues))
}
// blocker-b blocks only issue-1
if issues, ok := result["blocker-b"]; !ok {
t.Error("Expected blocker-b in map")
} else if len(issues) != 1 {
t.Errorf("blocker-b blocks %d issues, want 1", len(issues))
}
})
}
// TestPostCreateWritesDoltCommit tests that post-create metadata (deps, labels)
// is committed to Dolt after issue creation (GH#2009 regression test).
func TestPostCreateWritesDoltCommit(t *testing.T) {
t.Parallel()
ctx := context.Background()
tmpDir := t.TempDir()
testDB := filepath.Join(tmpDir, ".beads", "beads.db")
s := newTestStore(t, testDB)
t.Run("LabelsPersistedAfterCommit", func(t *testing.T) {
// Create an issue
issue := &types.Issue{
Title: "Issue with label",
Status: types.StatusOpen,
Priority: 2,
IssueType: types.TypeTask,
CreatedAt: time.Now(),
}
if err := s.CreateIssue(ctx, issue, "test"); err != nil {
t.Fatalf("Failed to create issue: %v", err)
}
// Add label (post-create write)
if err := s.AddLabel(ctx, issue.ID, "important", "test"); err != nil {
t.Fatalf("Failed to add label: %v", err)
}
// Commit (like postCreateWrites does)
if err := s.Commit(ctx, "test: post-create metadata"); err != nil {
// Dolt may return "nothing to commit" if auto-commit is on
t.Logf("Commit returned: %v (may be expected with auto-commit)", err)
}
// Verify label is retrievable
labels, err := s.GetLabels(ctx, issue.ID)
if err != nil {
t.Fatalf("Failed to get labels: %v", err)
}
found := false
for _, l := range labels {
if l == "important" {
found = true
}
}
if !found {
t.Errorf("Label 'important' not found after commit, got: %v", labels)
}
})
t.Run("DependencyPersistedAfterCommit", func(t *testing.T) {
// Create parent and child issues
parent := &types.Issue{
Title: "Parent issue",
Status: types.StatusOpen,
Priority: 1,
IssueType: types.TypeEpic,
CreatedAt: time.Now(),
}
child := &types.Issue{
Title: "Child issue",
Status: types.StatusOpen,
Priority: 2,
IssueType: types.TypeTask,
CreatedAt: time.Now(),
}
if err := s.CreateIssue(ctx, parent, "test"); err != nil {
t.Fatalf("Failed to create parent: %v", err)
}
if err := s.CreateIssue(ctx, child, "test"); err != nil {
t.Fatalf("Failed to create child: %v", err)
}
// Add dependency (post-create write)
if err := s.AddDependency(ctx, &types.Dependency{
IssueID: child.ID,
DependsOnID: parent.ID,
Type: types.DepParentChild,
}, "test"); err != nil {
t.Fatalf("Failed to add dependency: %v", err)
}
// Commit
if err := s.Commit(ctx, "test: post-create dependency"); err != nil {
t.Logf("Commit returned: %v (may be expected with auto-commit)", err)
}
// Verify dependency is retrievable
deps, err := s.GetDependenciesWithMetadata(ctx, child.ID)
if err != nil {
t.Fatalf("Failed to get dependencies: %v", err)
}
found := false
for _, dep := range deps {
if dep.ID == parent.ID && dep.DependencyType == types.DepParentChild {
found = true
}
}
if !found {
t.Errorf("Parent-child dependency not found after commit")
}
})
}