24 lines
662 B
Markdown
24 lines
662 B
Markdown
# Incentive Loop Design
|
|
|
|
Phase 13 Track G incentive framework baseline.
|
|
|
|
## Core Loops
|
|
|
|
1. Operator loop:
|
|
- provide runtime/node availability -> receive network + service rewards.
|
|
2. Builder loop:
|
|
- publish useful skills/integrations -> receive usage-driven demand.
|
|
3. Trust loop:
|
|
- deliver reliably -> improve reputation -> increase task/marketplace opportunity.
|
|
|
|
## Required Design Inputs
|
|
|
|
- fee policy and reward distribution assumptions
|
|
- staking/deposit policy interactions
|
|
- reputation signal weighting for economic outcomes
|
|
|
|
## Guardrails
|
|
|
|
- anti-spam/economic policy gates remain mandatory
|
|
- incentive changes require governance review and rollout notes
|